Juarez 2002 Mission, Table of Contents
000 Introduction
003 Gateway Training Center Mission
005 Early Morning Start in Austin
010 El Paso Gateway
020 Loading up at Gateway
030 Juarez Church Compound
035 Dorm Bunks
040 Going Out
050 Anapra Site
060 The Team at Slab Start
070 Outhouse Fixup
075 Prepare Framing Pieces
080 Picking and Cutting Pieces
090 Fabricating Walls and Ceilings
095 Stack of Walls and Ceilings
100 Lunch and Walls go Up
110 Installing Center Beam
115 Dust Storm
120 Nailing Down Roof
125 Nailing Down Roof and View
130 Particle Board
135 Particle Board Nailing
140 Father Zuniga Visit
145 Particle Board Roof Finished
147 Roof Workers
150 Wire Cutting Nailing
160 Wire Finish
165 Stuccoing
170 Nailing
175 Interior Walls
180 Insulation Installation
185 Preparing Window & Door Molding
190 Eaves Completion & Briefing
200 Sheetrock Installation
205 Sheetrock Beam Covering
210 More Lunch & More Stucco
220 Electrical Wiring
230 Creating Front Door Blessing
240 Presentation of Keys and Bible
250 Team and Family in Front of Home
___ Word Article, April, 2002